News

Reclaiming the Flooded Lafa Basin: Work Begins in Accra

Discover how work begins in Accra to reclaim the flooded Lafa Basin, a vital step in Accra's water management plan.

Share this article
Work begins to reclaim Lafa basin to reduce flooding in Mallam, Weija and surrounding areas

Work has begun to reclaim the Lafa water retention basin at Mallam, as part of the government's efforts to reduce the risk of flooding in Mallam, Weija, Dansoman, and surrounding communities. The operation, led by the 48 Engineer Regiment of the Ghana Armed Forces, aims to restore the basin's capacity after years of accumulated solid waste, siltation, and illegal encroachment.

Restoring the Lafa Basin's Capacity

The Lafa water retention basin has been a vital component in managing flood risks in Accra. However, years of neglect and human activities have taken a toll on the basin's capacity. The operation to reclaim the basin is a crucial step towards restoring its ability to retain excess stormwater and reduce the impact of flooding on communities downstream.

Demolishing Illegal Structures and Dredging the Basin

The exercise involves demolishing illegal structures within the water reserve and dredging the basin to remove accumulated waste. The government has provided the necessary resources and equipment for the exercise. The accumulated waste will be disposed of at a designated landfill site, and the area will be cleared to make way for the construction of protective embankments.

A Broader National Effort

The operation is being coordinated by the Post-Flood Mitigation Task Force as part of a broader national effort to restore waterways and drainage channels across Accra. Similar flood mitigation works are underway at Oyarifa, East Legon, and around the Kpeshie Lagoon. Authorities are urging residents and other members of the public to cooperate with the taskforce and refrain from activities that obstruct waterways or undermine efforts to manage flood risks.

What's Next for the Lafa Basin?

The reclamation of the Lafa basin is expected to improve its capacity to retain excess stormwater and help reduce the impact of flooding on communities downstream. While the operation is a significant step towards mitigating flood risks in Accra, it is essential to address the root causes of the problem. Residents and authorities must work together to prevent further encroachment and ensure that the basin is protected for future generations.


Source: Joy Online